← Back to CRM Live · 5-min regen Marketing v2

Marketing v2 · experimental · 14d trial

Tuesday 7 July · refreshed 01:47:19

🎯 Our works — current marketing focus

From this week

No marketing items in current NOW.md active blocks. Mon-19 marketing sprint will populate.

Roadmap (May 2026 Marketing scope)

No matching roadmap entries.

Recent commits (last 14d, marketing-tagged)

No marketing commits in last 14d.

📤 Content — upload, library, drafts

P2 wiring (next session): Upload + library + composer reuse existing backend endpoints (/api/content/*, /api/messaging/*, creative-planner logic). No backend rebuild — only this render container is new. Old marketing-content.js + creative-planner.js stay on disk per operator constraint; deprecated banner active on those surfaces until 2026-06-15 sunset.

📲 Social — channels, scheduled posts, performance

📷 Instagram (@crossfitbodmin) Connected · status fetch P3
📘 Facebook (CrossFit Bodmin) Connected · status fetch P3
💬 WhatsApp Business Connected · status fetch P3
📨 Email (Listmonk + SES, pre-stage) Substrate ready · setup Mon-19 per ROADMAP
P3 wiring (~1 day after P2): channel-status polling, scheduled-post list, compose+schedule flow, performance snapshot. All wire to existing /api/social-*, /api/instagram/*, /api/metrics + Meta CAPI backend. Old marketing-social.js + creative-planner-live.js stay on disk until 2026-06-15 sunset.
▾ Old marketing surfaces (deprecated 2026-05-16, sunset 2026-06-15; sidebar nav still points here during MVP trial)

Files stay on disk per operator constraint 2026-05-16: "dont delete, we may come back to these later." Operator can revert by removing the deprecated header from any file; sidebar nav still points to current marketing-suite during trial.

Generated by crm/scripts/generate-marketing-view.js · concept doc: marketing-view-redesign.md · piecewise rebuild P1 of 4 · trial 14d